General Election November 5, 2022 · Western Placer Unified

Measure G - Western Placer Unified

To renovate/ modernize Carlin Coppin and Creekside Oaks Elementary Schools, Lincoln and Phoenix High Schools; complete Twelve Bridges High School; remove/ replace asbestos, lead pipes, roofs, electrical systems; supporting achievement in math, science, engineering, reading, arts and technology; improve safety/ security/ disabled access; prevent overcrowding; shall Western Placer Unified School District issue $185,000,000 in bonds at legal rates, annually levying approximately $54 per $100,000 of assessed valuation, generating approximately $9,400,000 annually while bonds are outstanding, requiring audits / citizens oversight?

Unlock full precinct-level election analysis Where candidates won and lost, precinct by precinct—the detail that explains the outcome.

Race Results

1
No
56.8% 15,109 +13.6
2
Yes
43.2% 11,487

Precinct Map

Showing winner and margin by precinct

Precinct-level election map

Subscribe to explore precinct results visually

Race Statistics

Electoral context for this race
Registration Advantage
R+13.8%
Turnout Advantage
•••••••
Partisanship
Median for similar races: ~XX
Party Alignment
Precincts won by ••
~XX of ~XX (~XX%)
Ballot Dropoff
~XX% of top-of-ticket voters

Geographic Breakdown

How this race performed across different geographies
Loading geographic data...

How Each Partisan Group Voted

Support levels across the ideological spectrum
Analyzing voting patterns...

Precinct Results

Find where support ran strongest across precincts.
Compare results across contests
Focus
Turnout
Margin
Loading...
Precinct Total Votes Winner Winner % Margin
Loading precinct data...
Page 1

--

Loading precinct data...
Help
Loading...
Loading...