Election Results
Dinuba Unified
This election's results
How Dinuba Unified voted in other elections
Candidate Races
1
Ballot Measures
1
Measure D
FAILED
62.7% Yes
+25.4%
To repair/update vocational/career, science, engineering, agricultural classrooms/labs; remove asbestos/ mold; provide safe drinking water; acquire, construct, repair facilities, sites, equipment, wiring, gas lines, leaky roofs; upgrade, security, emergency communications systems; shall Dinuba Unified Schoo] District's measure be adopted authorizing $42,000,000 in bonds at legal rates, levying 6¢ per $100 of assessed valuation ($2,800,000 annually) while bonds are outstanding, requiring oversight, public spending disclosure, all funds for local schools?
Yes
62.7%
+25.4%
4,213
No
37.3%
-25.4%
2,505