Election Results
Petaluma Joint Union High
This election's results
How Petaluma Joint Union High voted in other elections
Candidate Races
1
Ballot Measures
2
Measure AA
PASSED
62.8% Yes
+25.6%
To repair/ upgrade local high/ junior high school classrooms, science labs, technology/ job training facilities; improve fire/ earthquake safety/ campus security; remove hazardous materials like lead/ asbestos; repair leaky roofs, outdated portable classrooms, HVAC, electrical, plumbing; shall Petaluma Joint Union High School District’s measure be adopted authorizing $159,000,000 in bonds at legal rates, at $30 per $100,000 assessed value while bonds are outstanding ($9,100,000 annually), with independent oversight, and no funds for administrators?
Yes
62.8%
+25.6%
25,466
No
37.2%
-25.6%
15,074
Measure B
FAILED
63.4% Yes
+26.8%
To provide locally controlled funding for local junior high/ high schools that cannot be taken away by the state to attract/ retain excellent teachers; enhance math, science, engineering, technology, writing programs; maintain smaller class sizes; and prepare students for college/ careers, shall Petaluma Joint Union High School District’s measure be adopted levying an $89 educational parcel tax, raising $2,200,000 annually, for 8 years, with exemptions for seniors, no funds for administrators’ salaries and independent citizen oversight?
Yes
63.4%
+26.8%
15,857
No
36.6%
-26.8%
9,152