Election Results
Colusa Unified
This election's results
How Colusa Unified voted in other elections
Candidate Races
1
Ballot Measures
1
Measure C
PASSED
60.6% Yes
+21.2%
To repair or replace leaky roofs and windows, aging heating/cooling/plumbing/electrical systems; improve access for students with disabilities; repair, equip, construct science, technology, engineering, arts, and math classrooms/labs, sites; improve student safety/ security; shall Colusa Unified School District’s measure be adopted authorizing $13.8 million in bonds at legal rates, levying $.06/$100 of assessed value (averaging $1.1 million annually) while bonds are outstand, with no money for administrators, audits, independent oversight, and all funds locally controlled?
Yes
60.6%
+21.2%
1,673
No
39.4%
-21.2%
1,086