Menu
General Election November 5, 2024 · Fullerton Elementary

Measure N - Fullerton School District

To repair aging classrooms, labs and facilities at Fullerton elementary/middle schools to support student achievement in math, science, technology, arts and engineering; remove asbestos/lead pipes; fix deteriorating roofs, plumbing, sewer, electrical; repair, construct, acquire classrooms, sites, facilities and equipment; shall Fullerton School District’s measure authorizing $262,000,000 in bonds at legal rates be adopted, levying $30 per $100,000 assessed value ($15,000,000 annually) while bonds are outstanding, with citizen oversight and all money locally controlled?

Unlock full precinct-level election analysis Where candidates won and lost, precinct by precinct—the detail that explains the outcome.

Race Results

1
Yes
61.1% 29,824 +22.3
2
No
38.9% 18,957

Precinct Map

Showing winner and margin by precinct

Precinct-level election map

Subscribe to explore precinct results visually

Race Statistics

Electoral context for this race
Registration Advantage
D+8.4%
Turnout Advantage
••••••
Partisanship
Median for similar races: ~XX
Party Alignment
Precincts won by •••
~XX of ~XX (~XX%)
Ballot Dropoff
~XX% of top-of-ticket voters

Geographic Breakdown

How this race performed across different geographies
Loading geographic data...

How Each Partisan Group Voted

Support levels across the ideological spectrum
Analyzing voting patterns...

Precinct Results

Find where support ran strongest across precincts.
Compare results across contests
Focus
Turnout
Margin
Loading...
Precinct Total Votes Winner Winner % Margin
Loading precinct data...
Page 1

--

Loading precinct data...
Help
Loading...
Loading...